SWMS in South Australia: the 2 m fall threshold from 1 July 2026

Current at 28 September 2026 — reviewed against the harmonised Model WHS Regulations and Safe Work Australia's SWMS information sheet.

From 1 July 2026, construction work in South Australia with a risk of a person falling more than 2 metres is high risk construction work and needs a SWMS before it starts. SA previously used a 3 m threshold — it was the jurisdiction behind the "in some jurisdictions this is 3 metres" footnote in Safe Work Australia's SWMS guidance. The change aligns SA with the other harmonised states. Templates bought before the change that still say 3 m are now out of date for SA falls work.

What changed, exactly

South Australia's falls trigger for high risk construction work. Regulator: SafeWork SA, under the WHS Regulations 2012 (SA). Current at 28 September 2026.
Before 1 July 2026From 1 July 2026
Fall-risk threshold triggering a SWMSMore than 3 mMore than 2 m
AlignmentSA-specific variation from the model lawsSame as NSW, QLD, TAS, ACT, NT, WA (and Victoria's own 2 m rule)
Other 17 HRCW categoriesUnchanged — see the full model-law HRCW list

Who this catches

The band between 2 m and 3 m is exactly where a lot of electrical work happens: single-storey roof edges for solar PV installation, ladder and platform work on ceilings and switchrooms, mezzanines and top-of-scaffold runs. In SA those jobs previously needed no SWMS on falls grounds alone; from 1 July 2026 they do. (Much of that work was already HRCW on other grounds — energised services, ceiling spaces — but the falls line in your SWMS paperwork still has to be right.)

How to check the template you're using

Every SWMS in the Electrician SWMS Kit already reflects the SA change — the Model WHS version's falls item carries the note "SA: 2 m threshold applies from 1 July 2026 (previously 3 m)", and every document is dated. Many template packs sold today still say 3 m.

Get the Electrician SWMS Kit — A$59
21 documents, Word + PDF, current at September 2026. Or run the free pre-start SWMS checklist first.

South Australian SWMS questions

What changed on 1 July 2026?

The fall-risk threshold for high risk construction work dropped from more than 3 m to more than 2 m. Work in that band now needs a SWMS before it starts.

Is my old SWMS template still valid in SA?

If its HRCW checklist still says 3 m for falls, it's out of date for SA work from 1 July 2026. Everything else in the model-law checklist is unchanged.

Who regulates SWMS in South Australia?

SafeWork SA, under the Work Health and Safety Regulations 2012 (SA) — SA runs the harmonised Model WHS laws, so the Model WHS version of a template covers SA once the falls threshold is right.